Boil Water Notice for Community Public Water Systems

Due to the City of Houston issuing the boil water notice for low system pressure and Parkway UD receiving water from the City of Houston, the Texas Commission on Environmental Quality has required that Parkway U.D. (TX1010750) public water system to notify all customers to boil their water prior to consumption (e.g., washing hands/face, brushing teeth, drinking, etc). Children, seniors, and persons with weakened immune systems are particularly vulnerable to harmful bacteria, and all customers should follow these directions).

To ensure destruction of all harmful bacteria and other microbes, water for drinking, cooking, and ice making should be boiled and cooled prior to use for drinking water or human consumption purposes. The water should be brought to a vigorous rolling boil and then boiled for two minutes.

In lieu of boiling, individuals may purchase bottled water or obtain water from some other suitable source for drinking water or human consumption purposes.

When it is no longer necessary to boil the water, the public water system officials will notify customers that the water is safe for drinking water or human consumption purposes.

Once the boil water notice is no longer in effect, the public water system will issue a notice to customers that rescinds the boil water notice in a manner similar to this notice.

Please share this information with all the other people who drink this water, especially those who may not have received this notice directly (for example, people in apartments, nursing homes, schools, and businesses). You can do this by posting this notice in a public place or distributing copies by hand or mail.

If you have questions concerning this matter, you may contact Parkway UD at 281-651-1618.

Virtual Community Engagement Meeting for the Feasibility Study of Stormwater Conveyance Tunnels, Phase 2

HCFCD PROJECT ID Z100-00-00-P019

The Harris County Flood Control District will hold a community engagement meeting to share Phase 2 results for the Feasibility Study of Stormwater Conveyance Tunnels. The purpose of this meeting is to inform residents about the status of the Tunnels study and share study information.

The Feasibility Study of Stormwater Conveyance Tunnels is investigating the potential to reduce flooding risks in Harris County by the construction of large-diameter, deep underground tunnels to convey stormwater. Phase 2 of this study received funding from the U.S. Department of Housing and Urban Development’s Community Development Block Grant Disaster Recovery program. Community engagement is an important component of this study, and we invite your participation as we consider further investigation of a tunnel system.

The Virtual Community Engagement Meeting will be held on:
Thursday, June 16, 2022
6:30 p.m. – 7:30 p.m.
Join online at: PublicInput.com/Tunnels
Or by phone* at 855-925-2801 with Meeting Code: 9622

The meeting will begin with a brief presentation to share project updates, followed by a moderated Q&A session with Flood Control District team members. Residents will be able to submit questions, comments and input before, during and after the meeting, which will be considered during project development. Any comments not addressed during the Q&A session will receive a response after the conclusion of the public comment period.

Even if you are unable to attend the live meeting, residents are encouraged to register for the meeting to receive future project updates. A recorded version of the meeting will be available on the Flood Control District’s website and YouTube channel after the event. Meeting accommodations can be made for those with disabilities. If needed, please contact 346-286-4040 at least three business days prior to the meeting. For questions, please contact the Flood Control District at 346-286-4000, or fill out the comment form online at hcfcd.org/tunnels.

Esta junta de participación comunitaria se llevará a cabo en inglés; sin embargo, el Flood Control District proporcionará intérpretes de idiomas y materiales traducidos a pedido. En caso de necesidad, comuníquese al 346-286-4040 al menos tres días hábiles antes de la junta.

*If you attend by phone only, maps and other exhibits will not be visible. However, information will be available after the meeting on the project webpage at hcfcd.org/tunnels.

Virtual Community Engagement Meeting for the Lower Greens Bayou Project

HCFCD PROJECT ID: P100-00-00-P002 – BOND PROJECT Z-03

The Harris County Flood Control District will hold a virtual Community Engagement Meeting for the Lower Greens Bayou Analysis Project located in the Greens Bayou watershed. The purpose of this meeting is to inform residents about the status of the project and share project information.

The Lower Greens Bayou Analysis Project seeks to make improvements to reduce the risk of flooding in the area. This project will be paid for with funds from the 2018 Bond Program, which were approved by Harris County voters on August 25, 2018. Community engagement is an important component of the Bond Program, and we invite your participation as the program is implemented.

The Virtual Community Engagement Meeting will be held on:
Wednesday, April 6, 2022
6:30 – 7:30 p.m.

Join online at: PublicInput.com/LGreens
Or by phone* at 855-925-2801 with Meeting Code: 9629

The meeting will begin with a brief presentation to share project updates, followed by a moderated Q&A session with Flood Control District team members. Residents will be able to submit questions and comments before, during and after the meeting and throughout the public comment period. Any comments not addressed during the Q&A session will receive a response at the conclusion of the public comment period. Additionally, a community engagement meeting will be held on the Greens Mid-Reach Channel Conveyance Improvements Project next week on April 14. You can find information on how to attend the meeting at hcfcd.org/c-20.

Even if you are unable to attend the live meeting, residents are encouraged to register for the meeting to receive future project updates. A recorded version of the meeting will be available on the Flood Control District’s website and YouTube channel after the event. Meeting accommodations can be made for those with disabilities. If needed, please contact 346-286-4000 at least 48 hours prior to the meeting. For questions, please contact the Flood Control District at 346-286-4000, or fill out the comment form online at www.hcfcd.org/LowerGreens.

*If you attend by phone only, maps and other exhibits will not be visible. However, information will be available after the meeting on the project webpage at www.hcfcd.org/LowerGreens.


Reunión Virtual de Participación Comunitaria para el Proyecto de Análisis de Lower Greens Bayou

HCFCD PROYECTO P100-00-00-P002 – PROYECTO DE BONOS Z-03

El Harris County Flood Control District (distrito de control de inundaciones del condado Harris) llevará a cabo una reunión virtual de participación comunitaria para el proyecto de análisis de Lower Greens Bayou, ubicado en la cuenca de Greens Bayou. El objetivo de esta reunión es informar a los residentes acerca del estado el proyecto y compartir información sobre el proyecto.

El proyecto de análisis de Lower Greens Bayou pretende realizar mejoras para reducir el riesgo de inundaciones en la zona. Este proyecto recibirá fondos del Programa de Bonos 2018, que fue aprobado por los votantes del Condado de Harris el 25 de agosto de 2018. La participación comunitaria es un factor importante en el Programa de Bonos y le invitamos a asistir a medida que se vaya implementando el programa.

La reunión de participación comunitaria se llevará a cabo de manera virtual en:
Miércoles, 6 de Abril de 2022
6:30 – 7:30 p.m.
Conéctese aquí: PublicInput.com/LGreens
O por teléfono* al 855-925-2801 utilizando el código de la reunión: 9629

La reunión comenzará con una breve presentación para compartir las actualizaciones del proyecto, seguida de una sesión de preguntas y respuestas moderada por miembros del Flood Control District. Los residentes podrán enviar preguntas y comentarios antes, durante y después de la reunión y durante el período de comentarios públicos. Cualquier comentario que no sea respondido durante la sesión de preguntas recibirá una respuesta al final del período de comentarios públicos. Además, una reunión de participación comunitaria para el proyecto de alcance medio de mejoras en el transporte del canal en Greens Bayou se llevará a cabo la próxima semana el 14 de abril. Encuentre información sobre cómo asistir a la reunión en hcfcd.org/c-20.

Incluso si no puede asistir a la reunión en vivo, se les recomienda a los residentes que se registren para la reunión y recibir actualizaciones del proyecto en el futuro. Una versión grabada de la reunión estará disponible en la página web y en el canal de YouTube del Flood Control District después del evento. Se pueden hacer acomodaciones para personas con discapacidad. Si es necesario, comuníquese al 346-286-4000 al menos 48 horas antes de la reunión. Si tiene preguntas, comuníquese con el Flood Control District al 346-286-4000, o llene el formulario de comentarios en: www.hcfcd.org/LowerGreens.

*Si solo asiste por teléfono, los mapas y otra exhibiciones no serán visibles. Sin embargo, la información estará disponible después de la reunion en la página web del proyecto en www.hcfcd.org/LowerGreens.